Corporate Social Responsibility
MDS
The objective of this initiative was to build two (2) standard houses for the humble Tsholofelo Family of thirty (30) people.
MDS
The objective of this initiative was to build two (2) standard houses for the humble Tsholofelo Family of thirty (30) people.
MDS
The objective of this initiative was to build two (2) standard houses for the humble Tsholofelo Family of thirty (30) people.
MDS
The objective of this initiative was to build two (2) standard houses for the humble Tsholofelo Family of thirty (30) people.
Marung are currently the drilling Contractor for blasthole drilling at Lucara Botswana’s Karowe Diamond Mine.
Our employee work force. MDS has acquired the most skilled and dedicated engineers
On and off-site vehicle, we have a fleet of 4×4 we used to in mine operations
We have high quality machines. We have purchased top notch drilling machines that have a long life span and produce best results.
The machines are looked after by a very competent engineering team with over 20 years’ experience in heavy plant specializing in drill rigs maintenance. MDS has an account with Sandvik Botswana for drill rig spares and consumables. The primary equipment above is supported by equally new support equipment which includes LDVs, Water trailers, Combis and Lubricant trailers.